Lots of work was done this week.
Starting with the T1-11 getting put up.
View from upstairs.
Future kitchen/lunch area
Then came the plumbing of the downstairs bathroom
Future utility sink and water heater outside the bathroom.
Wall!
The beginning of the upstairs bathroom shower.
The 3rd window was installed adding more light.
View from the lunch area
And the most exciting part...
The 4th window and huge hole that will soon be the door!
[the plywood was set there only so that nobody fell out]